Energy Backup: Change Orders

Updated over 3 weeks ago

Change Order Parameters & Thresholds

This section details various scenarios that may require a change order, and the business rules associated with those scenarios.

Change Type

Definition

Business Rule

Notes

Customer Name / Add Customer

Any change to the applicant(s) or names

New Contract Signature Required

Click to view

Any changes to person(s) on the credit application will require a new contract. In some cases, this may simply require a brand new account altogether.

Address

Property address

New Contract Signature Required

Pricing,

Payment,

or Lease Term

System price, payment, escalator, or term length

New Contract Signature Required

Equipment Manufacturer

Change in manufacturer

New Contract Signature Required

Click to view

Not required if only battery model # changes with no material change in specifications (such as capacity), or if switching from a domestic to non-domestic model, for example

Quantity

Change in battery count

New Contract Signature Required

Configuration

Change in type of backup (backup OR arbitrage)

New Contract Signature Required

Battery Specification

Change in kWh capacity

New Contract Signature Required

Peripheral Equipment

Changes in battery peripheral equipment (e.g., backup switch vs. gateway for PW3)

No Change Order Required

Click to view

Flexibility to use the correct equipment required for the site

Steps to Complete a Change Order

Follow the below steps to complete a change order within the LR portal, and execute new contracts. The high level steps are below. Note that:

  • LightReach support can provide guidance on change orders. However...

  • LightReach support cannot manipulate pricing changes or execute price-related change orders on the Installer behalf. Sensitive information such as quote selection is the responsibility of the Installer.

First, void the initial contract (if applicable). Then, proceed to void the current quote:

Then, proceed to create a new quote, select & save. The new contract can now be sent:

NOTE: Images above currently reflect quotes from the solar program. However, the change order and new quote/ contract procedure for Energy Backup is identical

Important things to note

  • Once a contract is sent, the customers payment rate and system price are locked in.

  • Any changes in pricing calculation will not go into effect unless a change order (new contract) is executed.